Plasterer

Scope of Works — 32a Archbold Road, Roseville NSW 2069

2

Tasks

1

Rooms

1

Phases

0%

Complete

Not Started: 2

Phase Coverage

Pre-Con

Design

Approvals

Demo

Build

Finishes

External

Summary by Room

RoomTasksDonePhases
Upstairs Bathroom20Pre-Con

Detailed Scope

Upstairs Bathroom

2 tasks

Pre-Construction Planning

FF Bathroom — GF ceiling patch below WC

High

Not Started

3 man-hrs = A[price hidden]. PARALLEL - downstairs, off critical path.

1 lotUpstairs BathroomPre-Construction Planning

FF Bathroom — wet-area board + set joints (rapid-set)

High

Not Started

12 man-hrs (2 plasterers) = A[price hidden]. Rapid-set compound 3 coats through the day. Level 4 finish - walls above the tile line are now visible. Materials: villaboard 360 + compound 135.

1 lotUpstairs BathroomPre-Construction Planning