Flooring
Scope of Works — 32a Archbold Road, Roseville NSW 2069
11
Tasks
8
Rooms
4
Phases
0%
Complete
Phase Coverage
Pre-Con
Design
Approvals
Demo
Build
Finishes
External
Summary by Room
| Room | Tasks | Done | Phases |
|---|---|---|---|
| Kitchen | 3 | 0 | Pre-Con, Demo, Finishes |
| Lounge | 2 | 0 | Pre-Con, Finishes |
| Dining | 1 | 0 | Build |
| Study | 1 | 0 | Build |
| Bedroom 3 | 1 | 0 | Build |
| Foyer | 1 | 0 | Build |
| Bedroom 2 | 1 | 0 | Build |
| Master Suite | 1 | 0 | Build |
Detailed Scope
Kitchen
3 tasksPre-Construction Planning
Patch ceiling, walls, floor after wall removal
HighNot Started
REVISED: Patching after wall removal. Reduced scope.
Demolition & Strip-out
Temporary propping & protection (floors, existing services)
HighNot Started
Finishes
[DEFERRED] Install kitchen flooring (moved to Extension phase)
HighWaiting / Blocked
DEFERRED to Extension phase. Kitchen floor will be done as part of continuous timber flooring across kitchen + dining + lounge when extension structural work completes. Estimated cost at that point: A[price hidden] (40m² engineered oak). Kept as placeholder.
Lounge
2 tasksPre-Construction Planning
Ground floor — flooring refinish / extension into open plan
HighNot Started
Existing timber floors may need extending / patching into the new open plan area. Match existing boards or full refinish.
Finishes
Lounge — supply & install timber flooring
MediumNot Started
Dining
1 tasksConstruction & Fitout
Dining — install timber flooring (continuous with kitchen)
MediumNot Started
Study
1 tasksConstruction & Fitout
Study — flooring refinish
MediumNot Started
Bedroom 3
1 tasksConstruction & Fitout
Bedroom 3 — flooring (sand & polish or new)
MediumNot Started
Foyer
1 tasksConstruction & Fitout
Foyer — flooring refinish / replace
MediumNot Started
Bedroom 2
1 tasksConstruction & Fitout
Bedroom 2 — flooring (sand & polish or new)
MediumNot Started
Master Suite
1 tasksConstruction & Fitout
Master Suite — flooring (sand & polish or new)
MediumNot Started
Sequencing & Dependencies
Tasks that must be coordinated with other trades or completed in a specific order.
Temporary propping & protection (floors, existing services)
Depends on
Blocks
Patch ceiling, walls, floor after wall removal
Depends on
Blocks
Lounge — supply & install timber flooring
Depends on
Blocks
Interested in quoting?